combined 250 bhp horizontal steam boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :combined 250 bhp horizontal steam boiler
  • Supply Capacity : 10 units/month :combined 250 bhp horizontal steam boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Board Exam1 | PDF | Enthalpy | Pressure - Scribd

    A steam generating plant consisting of a boiler, an economizer and super heater generates superheated steam at the rate of 50 tons per hr. feedwater enters the boiler at 5 MPa and 120 °C. Steam leaves the superheater at 4.5 MPa and 320 °C. if the coal used has a heating value of 30,000 kJ/kg, calculate the no. of tons of coal fired per hr for Get Price

  • MCQ in Power Plant Engineering Part 8 | ME Board Exam

    Dec 19, 2020 · 379. A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3, boiler rating is 200%, boiler efficiency is 65% and heating surface area is 0.91 m 2 per bo.Hp. and the heating value of fuel is 18,400 kCal/kg. The total coal available in the bunker is 50,000 kg.Get Price

  • Combustion Evaluation: Sources and Control Devices

    In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price

  • Board Exam1 | PDF | Enthalpy | Pressure - Scribd

    A steam generating plant consisting of a boiler, an economizer and super heater generates superheated steam at the rate of 50 tons per hr. feedwater enters the boiler at 5 MPa and 120 °C. Steam leaves the superheater at 4.5 MPa and 320 °C. if the coal used has a heating value of 30,000 kJ/kg, calculate the no. of tons of coal fired per hr for Get Price

  • Compre Special Project (ppe &ipe) [vnd5gjm03rlx]

    ms (1947.8) = 4200(0.60)(195-2) Thus; (a) ms = 249.69 kg 57. Supplementary Problem A high pressure steam generator is to be fitted with convection type superheater having 72 elements in parallel. Steam at the rate of 70,000 kg/hr from the boiler drum enters the superheater inlet header at 8.3 Mpa and 485oC.Get Price

  • Combustion Evaluation: Sources and Control Devices

    In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price

  • Basic Power and Industrial Plant Engineering - VSIP.INFO

    Boiler - 18 (ME Bd. Apr. 1997) A steam boiler on a test generates 885,000 Ib of steam in a 4-hollr period. The average steam pressure is 400 psia, the average steam temperature is 700°F, and the average temperature of the feedwater supplied to the boiler is 280°F.Get Price

  • Compre Special Project (ppe &ipe) [vnd5gjm03rlx]

    ms (1947.8) = 4200(0.60)(195-2) Thus; (a) ms = 249.69 kg 57. Supplementary Problem A high pressure steam generator is to be fitted with convection type superheater having 72 elements in parallel. Steam at the rate of 70,000 kg/hr from the boiler drum enters the superheater inlet header at 8.3 Mpa and 485oC.Get Price

  • MCQ in Power Plant Engineering Part 8 | ME Board Exam

    Dec 19, 2020 · 379. A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3, boiler rating is 200%, boiler efficiency is 65% and heating surface area is 0.91 m 2 per bo.Hp. and the heating value of fuel is 18,400 kCal/kg. The total coal available in the bunker is 50,000 kg.Get Price

  • Compre Special Project (PPE &IPE) | PDF | Boiler | Thermal

    Steam at the rate of 70,000 kg/hr from the boiler drum enters the superheater inlet header at 8.3 Mpa and 485oC. Combustion products at 980oC enters the superheater proper at the rate of 160,000kg/hr. Superheater elements are made of 60 mm O.D. …Get Price

  • Mechanical Engineering Problems With Solution - DocShare.tips

    Steam out Water in Q5–2 Boiler q1–2 = w1–2 (h2 – h1) + (kE2 – kE1) + PE2 – pE1) – q1–2 = h2 – h1 Heat is lost by the system to the cooling water q1–2 = h1 – h2 2. reservoirs at temperature of 400C and – 200C. The heat transfer to the heat engine is 2000KJ and net work output of combined engine refrigerator plant is Get Price

  • Mechanical Engineering Problems With Solution - DocShare.tips

    Steam out Water in Q5–2 Boiler q1–2 = w1–2 (h2 – h1) + (kE2 – kE1) + PE2 – pE1) – q1–2 = h2 – h1 Heat is lost by the system to the cooling water q1–2 = h1 – h2 2. reservoirs at temperature of 400C and – 200C. The heat transfer to the heat engine is 2000KJ and net work output of combined engine refrigerator plant is Get Price

  • Compre Special Project (PPE &IPE) | PDF | Boiler | Thermal

    Steam at the rate of 70,000 kg/hr from the boiler drum enters the superheater inlet header at 8.3 Mpa and 485oC. Combustion products at 980oC enters the superheater proper at the rate of 160,000kg/hr. Superheater elements are made of 60 mm O.D. …Get Price

  • Basic Power and Industrial Plant Engineering - VSIP.INFO

    Boiler - 18 (ME Bd. Apr. 1997) A steam boiler on a test generates 885,000 Ib of steam in a 4-hollr period. The average steam pressure is 400 psia, the average steam temperature is 700°F, and the average temperature of the feedwater supplied to the boiler is 280°F.Get Price