4000 kg Gas fired Steam Boiler Exported to indonesia
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
Dec 12, 2021 · Her auxiliary machinery includes three MAN-B&W 7L27/38 generators providing 2,346 kW, three MAN-B&W 9L27/38 generators providing 2,986 kW, and a single Cummins VTA-28-DM emergency generator providing 500 kW. She has an Alfa Laval Qingdao CHR exhaust gas boiler, and an Alfa Laval Qingdao CHO oil fired boiler.Get Price
Dec 12, 2021 · Her auxiliary machinery includes three MAN-B&W 7L27/38 generators providing 2,346 kW, three MAN-B&W 9L27/38 generators providing 2,986 kW, and a single Cummins VTA-28-DM emergency generator providing 500 kW. She has an Alfa Laval Qingdao CHR exhaust gas boiler, and an Alfa Laval Qingdao CHO oil fired boiler.Get Price
An automatic blowdown control system continuously monitors the boiler water, adjusts the rate of blowdown, and maintains the specific conductance of the boiler water at the desired level. The basic components of an automatic blowdown control system include a measurement assembly, a control center, and a modulating blowdown control valve.Get Price
A cylindrical steam boiler is to be constructed having a capacity of 1000 cu. m. The material for the sides cost P 2000.00 per square meter and for the ends P 3000.00 per square meter. Find the radius so that the cost is least. A. 3.52 m B. 4.12 m C. 4.73 m D. 5.25 m 448.Get Price
As the lighting charcoal burns away, continue adding coal to maintain the level of the fire. As soon as the boiler pressure reaches around 30 psi the electric or other blower can be removed and the locomotive's own steam blower will take over.Get Price
A cylindrical steam boiler is to be constructed having a capacity of 1000 cu. m. The material for the sides cost P 2000.00 per square meter and for the ends P 3000.00 per square meter. Find the radius so that the cost is least. A. 3.52 m B. 4.12 m C. 4.73 m D. 5.25 m 448.Get Price
The Grover Shoe Factory disaster was an industrial explosion, building collapse and fire that killed 58 people and injured 150 when it leveled the R. B. Grover shoe factory in Brockton, Massachusetts on March 20, 1905. Following a boiler explosion, the four-story wooden building collapsed and the ruins burst into flames, incinerating workers trapped in the wreckage.Get Price