500kg h steam electric steam generator and boiler
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
Each steam boiler and fired pressure vessel installed and operate in this country shall have a valid certificate of fitness (CF). Hence, the steam boiler and fired pressure vessel shall first obtain design approval from the Department of Occupational Safety and Health, Headquarters before fabrication, installation or operation.Get Price
A steam generating plant consisting of a boiler, an economizer and super heater generates superheated steam at the rate of 50 tons per hr. feedwater enters the boiler at 5 MPa and 120 °C. Steam leaves the superheater at 4.5 MPa and 320 °C. if the coal used has a heating value of 30,000 kJ/kg, calculate the no. of tons of coal fired per hr for Get Price
Each steam boiler and fired pressure vessel installed and operate in this country shall have a valid certificate of fitness (CF). Hence, the steam boiler and fired pressure vessel shall first obtain design approval from the Department of Occupational Safety and Health, Headquarters before fabrication, installation or operation.Get Price